The Sharp Homes Custom Home Building Process

Building a custom home should feel clear, not chaotic. Sharp follows a documented, five-stage process managed in Buildertrend. Most homes take about seven to nine months to build and eight to twelve months from design to move-in.

7-9months to build
8-12months total
5documented stages
Back Exterior

The direct answer

How Long Does It Take to Build a Custom Home?

For most Sharp homes, construction runs about seven to nine months once you break ground. With design and selections, plan on eight to twelve months from your first sit-down to move-in. We confirm your timeline before you sign.

See it first

You See the Home Before We Break Ground

Sharp employs a full-time Rendering Specialist, which no other builder in Wichita does. During design you get photo-quality renderings of your home: the elevation, your finishes together rather than as separate samples, and the main living spaces at their real ceiling heights.

It happens in-house and alongside the architect, so when your plan changes the renderings change with it. That is the whole value. Every change you make looking at a rendering is a change made on paper, where it costs nothing.

The five stages

The Five Stages of Your Build

Every Sharp build moves through the same five stages, so you always know which stage you are in and what comes next.

1 3-4 weeks

Planning & Approvals

Finalize plan, selections, permits, and approvals.

2 9-12 weeks

Foundation & Frame

Site work, foundation, framing, roof, and weather-tight shell.

3 8-10 weeks

Drywall

Mechanicals, insulation, and drywall.

4 6-8 weeks

Finishes & Interior

Cabinets, counters, flooring, trim, fixtures, and paint.

5 4-5 weeks

Final Inspection & Handover

Inspections, punch list, and your walkthrough.

Great Room From Living

How we keep you informed

How We Keep You Informed

Communication is the part buyers remember. Craig and the team communicate cost overages or savings during the entire process, not just at closing. You get Craig’s personal cell number, and every selection and update lives in Buildertrend.

Selections

Selections and Your Design Center Visit

Selections happen at our in-office Design Center at 4006 Hoover, where cabinets, granite, doors, trim, and hardware are on display in one place. That saves trips across town and helps you choose with cost in view.

See the selection process

After you move in

After You Move In

Your home is covered by a one-year third-party warranty through ProHome and a 12-month defects liability period, with manufacturer and trade warranties on components. An optional 10-year structural warranty is available. We do not disappear at closing.

Good to know

Building Process FAQs

How long does it take to build a custom home in Wichita?

Construction runs about seven to nine months for most Sharp homes. From your first sit-down through design, selections, and build, plan on eight to twelve months to move-in. We confirm your timeline before you sign.

What are the stages of building a custom home?

Sharp uses five stages: Planning and Approvals (3 to 4 weeks), Foundation and Frame (9 to 12 weeks), Drywall (8 to 10 weeks), Finishes and Interior (6 to 8 weeks), and Final Inspection and Handover (4 to 5 weeks).

How do I keep track of my build?

Sharp manages every build in Buildertrend, where your selections, schedule, and updates live. You also get Craig Sharp’s personal cell number, and the team communicates cost changes throughout the build.

Where do I make my selections?

At Sharp’s in-office Design Center at 4006 Hoover, where cabinets, granite, doors, trim, and hardware are on display. Making selections in one place saves time and keeps cost in view. The team walks the process with you.

What warranty comes with a Sharp home?

A one-year third-party warranty through ProHome plus a 12-month defects liability period, with manufacturer and trade warranties on components. An optional 10-year structural warranty is available for an additional cost.

Start Your Build With Sharp

Ready to begin? Call or contact us to schedule your first sit-down. We will walk you through the process, your plan options, and your timeline, usually within 24 to 48 hours.