How long does it take to build a home?


Tags:

At Sharp Homes, our typical construction timeline for a “typical home” is 4–5 months, assuming selections are made on schedule. That said, there are several factors that can affect that timing, including weather, material lead times, change orders, the size and complexity of the home, and site conditions.